What is the kerb laying process?

Our process includes:

  • Site consultation and assessment
  • Design and planning
  • Excavation and preparation of a solid concrete foundation
  • Precise kerb laying on a concrete bed with proper haunching
  • Final inspection for alignment, level, and drainage

This ensures durable, professional results every time.