How do you prepare the ground before laying tarmac?

Our process includes a detailed site survey, excavation if needed, installation of a solid sub-base, and proper edging/kerbing. This professional preparation prevents sinking, cracking, and future issues — something that sets TAG SW Limited apart in Bath.